Services · Moves
Your platform has an end-of-support date. Your site does not have to.
We move websites and web apps off platforms that stop getting security fixes, onto a supported stack. That covers Drupal 7 and 10, Joomla 3 and 4, Kentico 13, Umbraco 13, older Sitecore XP, Magento content pages, old WordPress and old PHP. The new site keeps every URL, form and search tag your rankings hang on, and serves static pages from the edge. Drupal 10 support ends December 9, 2026. The inventory takes 5 business days and a typical site goes live 4 to 8 weeks after the quote: the calendar is not negotiable; the plan is.
- 5 business daysinventory, no charge, ends in a fixed quote
- From $4,900a typical site, fixed quote
- From $18,900stores and web apps
- 4-8 weeksa typical site, live after the quote
Who it is for
Who comes to us for this
Organizations of 20 to 500 people on a platform with an end date, and anyone whose last developer left with the admin password. The site has to keep working while it moves, so nothing switches until the new site matches the old one. You get a fixed price before work starts, a date in writing, and a switch you can undo.
Firms that sell web work to their own clients can have moves and upgrades done under their brand. They keep the client and the contract; we do the work and answer to them. Partner terms on request.
What you get
- An inventory: pages, templates, forms, integrations, logins
- A new site on a supported stack, usually static pages on Cloudflare plus a little server code
- Every old URL answering 200 or one 301
- Parity checks before launch: visual diff, links, forms, search tags, speed
- A switch plan with a rollback
- Logins, member areas, stores and integrations kept on a supported system, priced in the inventory
The dates
When security fixes stop
A site past its date keeps running; it just stops getting security fixes. These are the platforms we move most often, with dates checked October 31, 2026 against the vendor's own lifecycle page where one exists.
| Platform | Security fixes end | Usually |
|---|---|---|
| Joomla 3 | August 17, 2023, ended | Move. The next version is a rewrite anyway. |
| Drupal 7 | January 5, 2025, ended | Move. Drupal 7 to 10 or 11 is a rebuild. |
| Joomla 4 | October 2025, ended | Upgrade to 5, or move. |
| PHP 8.1 | December 31, 2025, ended | Upgrade PHP; test the plugins first. |
| Drupal 10 | December 9, 2026 | An upgrade to 11, not a move. |
| Umbraco 13 | December 14, 2026 | Upgrade or move; paid extended support exists. |
| Kentico Xperience 13 | December 31, 2026 | Move or migrate. |
| PHP 8.2 | December 31, 2026 | Upgrade PHP to 8.4. |
The full list, with sources and the days left, is on the end-of-support calendar. It can email you 90 days before each date.
Upgrades
Sometimes the answer is an upgrade
When the next version is a step, not a rebuild, we upgrade instead of moving. Drupal 10 to 11 is the common one. You get a 2-day check for $1,500, credited to the upgrade, then a fixed quote and a schedule that lands before the end-of-support date when the work fits. If an upgrade beats a move, we say so on the first call, even when it means a smaller job for us.
How an upgrade runs
- 2-day check, $1,500, credited: modules, themes, PHP version, custom code
- A fixed quote and a date, in writing
- Upgrade on a staging copy, then the same parity checks as a move
- Switch, with the old version ready to come back
How it runs
Step by step
- Inventory, in 5 business days, at no charge: we crawl the site and read the admin. You get the list of everything that moves, the risks ranked, and a fixed quote with a date
- Build: agents move templates and content in bulk; an engineer checks every template and reviews every change. You see the new site in a demo every week
- Parity gate: the new site matches the old one on pages, links, forms and search tags before anyone says "launch"
- Switch: DNS, redirects and forms change in one window, with the old site ready to come back
- After: the site is yours. Changes by your team, or by us by the hour
What it costs
The price
Most moves cost $4,900 to $9,900. Stores and web apps start at $18,900. The inventory costs nothing and sets a fixed quote before work starts, so logins, member areas and integrations are priced up front, not discovered in week three. Prices in US dollars; quotes in Canadian dollars on request.
Payment milestones follow a written acceptance list, not the calendar. Invoices are itemised by person, level and task. If the job turns out bigger than quoted, we stop and tell you in writing, with the options and a price for each. Nothing is billed that you did not approve.
Proof
This website moved off WordPress to static pages, built and checked by our own agents, with a person reviewing every change.
How this site is builtScope
What the fixed quote covers, and what it does not
The inventory decides the scope, so the line between the two is written down before work starts. Anything outside it gets its own written quote before anyone builds it.
In the fixed quote
- The inventory and the redirect plan for every old URL
- Templates and content moved to the new stack
- Forms, logins, member areas, stores and integrations listed in the inventory
- Parity checks: visual diff, links, forms, search tags, speed
- Accessibility targeting WCAG 2.2 AA, tested on real devices
- The switch window and the rollback
Not in the fixed quote
- New features or a redesign the inventory did not list: quoted separately, in writing
- Changes after launch: by your team, or by us by the hour
- Ongoing support: quoted per month
- 24/7 on-call: we work Monday to Friday, 8 am to 5 pm Pacific
- Search rankings: nobody controls them. We control the URLs and the redirects
Risks
What goes wrong in a move, and what we do about it
Most moves fail in the same few places. Each one has a check in the plan, not a promise in the proposal.
| Risk | How we handle it |
|---|---|
| Broken links after the switch | Every old URL is mapped to a page that answers 200 or to one 301, and checked before launch. |
| A login, form or integration nobody listed | The inventory crawls the site and reads the admin. Each item is priced before work starts. |
| The new site drifts from the old one | The parity gate compares pages, links, forms, search tags and speed before anyone says "launch". |
| Launch day goes wrong | DNS, redirects and forms change in one window, and the old site stays ready to come back. |
| The end-of-support date arrives first | The quote carries a date in writing. If we cannot make your date, we say so on the first call, not after the contract. |
| Your data and access | NDA before scoping, read access only after it. Secrets stay in your secret store. Content moves once, into your accounts. |
At the end
What you own
The new site runs in your accounts, and the code sits in your repository from the first commit. Intellectual property transfers to you in full on final payment. Content lives in plain files with an editor on top, so your team edits pages without a ticket to us. When the work ends, our access ends with it.
Handed over
- The code, in your repository
- The content, moved once into your accounts
- Logins and user data on a supported system you control
- Documentation and a runbook
- No copy of your data kept on our side
Questions
Will we lose our search rankings?
Rankings are the search engines' call, not ours. What we control: every old URL answers 200 or one 301, mapped and checked before the switch. Rankings can wobble for a few weeks after any move; broken links are what sink them.
How long does a move take?
The inventory takes 5 business days. A typical site goes live 4 to 8 weeks after the quote. Stores and web apps get their own schedule, in writing, with the quote.
Can our team edit the new site?
Yes. Content lives in plain files with an editor on top, or we make changes for you by the hour.
Why not just upgrade?
Sometimes that is the right call. Drupal 10 to 11, for example, is usually an upgrade, not a move, and we will say so on the first call. A move pays off when the next version is a rewrite anyway (Drupal 7, Joomla 3) or when a content site carries a CMS it no longer needs.
Who does the work?
Named senior engineers, introduced before the quote is signed. Agents move templates and content in bulk; an engineer checks every template and reviews every change. Vadym Chernega, our founder, reviews every engagement.
Do you keep a copy of our data?
No. Content moves once, into your accounts. Logins and user data stay on a supported system you control.
What happens after launch?
The site is yours. We work Monday to Friday, 8 am to 5 pm Pacific, with no 24/7 on-call today. Every fix we ship carries a 30-day warranty: if it breaks as built, we fix it at no charge. Ongoing support is quoted per month.
Tell us what you are working on.
A few sentences are enough. If there is code, we ask for read access after the NDA. We reply with what we would do first and what it costs.
Reply within one business day · A person reads it, usually with coffee