Insights

ROS 1 End of Life: What a Move Costs, by Package

ROS 1 Noetic stopped getting updates on May 31, 2025. Robots running it still work, but nobody upstream is fixing it. A move to ROS 2 is rarely one big job. It is a list of packages, and some cost far more than others.

Where ROS 1 stands

  • End of life. The ROS project's steering committee set the Noetic end-of-life date to May 31, 2025, the same day Ubuntu 20.04 left standard support. Noetic was the last ROS 1 release.
  • Infrastructure. In December 2025 the ROS infrastructure team announced it is shutting down the ROS 1 build farm (build.ros.org) and its package repository (repositories.ros.org). New ROS 1 package releases have nowhere to go.
  • What still works. Installed robots keep running. What stops is upstream security and bug fixes, new binary releases, and, over time, the people who know the code.

For a robot sold in North America, that last point matters most. A buyer's security review, an update to a radio module or a new customer integration all ask the same question: who maintains this software?

The move, package by package

A ROS 2 move is sized by counting packages and sorting them by type. These are the types we see in robot workspaces, from least to most work.

Package type What changes Relative effort
Messages, services, actions Definition files mostly carry over; build files and some field types change Small
Launch files XML launch files need a rewrite, often into Python launch files Small to medium
Parameters The global parameter server and dynamic_reconfigure give way to per-node parameters and callbacks Medium
Python nodes (rospy) New client library (rclpy), new node structure, timers and callbacks Medium
C++ nodes (roscpp) New client library (rclcpp), executors, quality-of-service settings on every topic Medium to large
Transforms tf calls move to tf2; timing assumptions get tested again Medium
Drivers and hardware interfaces Vendor drivers may have a ROS 2 version, or none; controllers move to ros2_control Large
Custom middleware and timing code Anything that relied on ROS 1 networking (roscore, TCPROS, nodelets) needs a new design on DDS Large
Recorded data and tools Old bag files need conversion; internal tools that read them need updates Small to medium

Two things decide the total more than the package count:

  1. Third-party packages. A package someone else maintains is cheap if a ROS 2 version exists and expensive if you have to port it yourself. Check each one before quoting anything.
  2. Tests. A package with simulation or unit tests can be ported and checked. A package without them needs tests written first, or every change is a guess on a live robot.

How to size your own move

  1. List the workspace. Every package, its type from the table above, and its size in lines of code.
  2. Mark dependencies. For each third-party package, note whether a maintained ROS 2 version exists.
  3. Find the hard ones. Drivers, custom middleware and anything real-time. These set the schedule.
  4. Pick the order. Messages first, then leaf nodes, then drivers. A bridge between ROS 1 and ROS 2 lets both run side by side while you move.
  5. Plan the tests. Simulation runs for each package before it reaches a robot.

The result is a package list with an effort size next to each line. That list, not a guess at the whole, is what a written quote should be built on.

Questions

Can we stay on ROS 1?

For a while. The robots keep running, and paid extended security maintenance for ROS 1 exists. It buys time; it does not remove the move. Plan the move while that time runs.

Do we have to move everything at once?

No. A bridge lets ROS 1 and ROS 2 nodes talk to each other, so the move can go package by package with the robot in service.

Which ROS 2 release should we target?

A long-term support release, so the next move is years away rather than months. Check the release's end-of-life date on the official ROS documentation before you start.

Still on Noetic? Ask for a free workspace scan: we list every package and size the move before you commit to anything.

Sources, opened November 23, 2026: Open Robotics Discourse, ROS Noetic End-of-Life: May 31, 2025; Open Robotics Discourse, Decommission of ROS 1 infrastructure (December 22, 2025).

Robots still on ROS 1?

Send the workspace or a package list. A senior engineer replies within one business day with the hard packages and what the move takes.

Ask for a free workspace scan

Reply within one business day · No passwords or keys, ever